[Services]
Furniture for every part of your office
Using your floor plan, we’ll make a list for workstations, meeting rooms and shared areas. It includes models, sizes and finishes so you can check the order before signing off and at handover.

[Short answer]
What you can check in advance
Turnkey office furnishings combine layout, furniture, logistics and installation in one contractual framework. The customer receives an agreed upon project, line-by-line specification and ready-made work areas instead of a set of unrelated purchases.
We’ll start with the floor plan and what your team needs. Then we can tell you what furniture fits, what it will cost and when we can install it.
Get a preliminary estimate[Price of error]
What to check before ordering
The main risk of separate procurement is incompatibility of sizes, finishes, deadlines and responsibilities. One missing article can stop the launch of an entire zone.
check passages, electrical and series compatibility
split the cost of goods, logistics and installation
[Expert review]
See how the furniture fits your office
For the task “Completing an office with turnkey furniture,” we check not a set of items, but the connection between people’s behavior, planning, engineering and operation. The three criteria below must appear in the design before ordering.
Dimensions and working clearances
We check the furniture not according to its nominal size, but together with the removal of the chair, opening of the facades, working passages and the route of entry.
- Required evidence
- Plan with dimensions of furniture, passages and opening areas
- What fails if overlooked
- During installation, tables are placed formally but block traffic, cabinets or doors.
Project Critical Path
We connect sample approval, production, finishing readiness, delivery and installation. The launch date is based on dependencies, not an optimistic promise.
- Required evidence
- A single schedule with responsible persons and decision freezing points
- What fails if overlooked
- Furniture arrives at an unfinished facility or installation begins after the date the employees leave.
Verifiable Acceptance
We determine in advance what is checked in terms of quantity, appearance, adjustments, stability, marking and compliance with the plan.
- Required evidence
- Acceptance checklist, defective statement and deadline for closing comments
- What fails if overlooked
- Disputes begin after installation because the parties do not have a common definition of the finished result.
[Result]
ready-made office with a single specification and a responsible contractor
The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.
- 01
Brief and plan
We collect staff, premises, restrictions, budget guidelines and launch date.
- 02
Planning and selection
We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.
- 03
Specification
We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.
- 04
Delivery and acceptance
We label each shipment by zone, assemble the furniture and close every item in the acceptance report.
[Catalog]
Furniture worth a closer look
Work tables and stations
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogOffice chairs
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogMeeting tables
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogStorage systems
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogUpholstered furniture
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalog[Q&A]
Questions about the solution “Turnkey office furnishings”
Direct answers without unconfirmed prices, terms and local promises.
Discuss the problemWhat is included in the solution “Turnkey office furnishings”?
The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.
What should be checked before approving the solution?
The main risk of separate procurement is incompatibility of sizes, finishes, deadlines and responsibilities. One missing article can stop the launch of an entire zone. First of all: fix the staffing program and functions of the premises
How should the completed result be accepted?
Result criterion: a finished office with a single specification and a responsible contractor. We check the layout, completeness, articles, finishes, assembly and comments on the act.
How is the cost calculated?
The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.
Is it possible to implement the project in another city in Kazakhstan?
Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.
What information is needed to get started?
You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.
[See also]
Related solutions
Office space planning
2D and 3D office planning: workstations, aisles, meeting rooms, storage and team growth scenarios.
More detailsDesign and engineering of a modern office
Concept, layout and selection of office furniture in a single visual and functional solution.
More detailsSelection of office furniture according to layout and budget
Professional selection of tables, chairs, storage and negotiation solutions with compatibility testing.
More details[Next step]
Get the project and line-by-line specification
Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.
