[Office scale]
Office equipment for 500 employees
Layout, furniture, budget structure and supply of an office for 500 employees.

[Short answer]
What you can check in advance
An office with 500 employees cannot be considered one desk per staff. It is necessary to add meeting rooms, managers, storage, waiting, focus zones, growth reserve and installation. First, the program of premises is checked, then a large-scale office or campus is formed.
We’ll start with the floor plan and what your team needs. Then we can tell you what furniture fits, what it will cost and when we can install it.
Get a preliminary estimate[Price of error]
What to check before ordering
The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment.
unify the main series and finishes
consider product, logistics and installation as separate blocks
[Expert review]
See how the furniture fits your office
For the task “Equipping an office for 500 employees,” we are checking not a set of items, but the connection between human behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.
Pilot before the main party
We assemble one typical place or room and check the fit, electrical, materials, assembly and cleaning in real mode.
- Required evidence
- Pilot protocol and list of changes before launching the batch
- What fails if overlooked
- The same mistake is repeated dozens of times and becomes expensive only after full delivery.
Project Critical Path
We connect sample approval, production, finishing readiness, delivery and installation. The launch date is based on dependencies, not an optimistic promise.
- Required evidence
- A single schedule with responsible persons and decision freezing points
- What fails if overlooked
- Furniture arrives at an unfinished facility or installation begins after the date the employees leave.
Refurbishment and repair
Before purchasing, we check the repeatability of the series, the availability of mechanisms and the procedure for identifying the position after the launch of the office.
- Required evidence
- Register of article numbers, finishes, delivery dates and compatible parts
- What fails if overlooked
- After a year, the workplace cannot be replicated without a visual compromise or replacement of the entire area.
[Result]
managed project for 500 employees
The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.
- 01
Brief and plan
We collect staff, premises, restrictions, budget guidelines and launch date.
- 02
Planning and selection
We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.
- 03
Specification
We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.
- 04
Delivery and acceptance
We label each shipment by zone, assemble the furniture and close every item in the acceptance report.
[Catalog]
Furniture worth a closer look
Work tables and stations
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogOffice chairs
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogMeeting tables
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogStorage systems
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogUpholstered furniture
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalog[Q&A]
Questions about the solution “Equipping an office for 500 employees”
Direct answers without unconfirmed prices, terms and local promises.
Discuss the problemWhat is included in the “Office configuration for 500 employees” solution?
The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.
What should be checked before approving the solution?
The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment. First things first: create a repeatable standard, logistics plan and service registry
How should the completed result be accepted?
Result criterion: managed project for 500 employees We check the layout, completeness, articles, finishes, assembly and comments on the act.
How is the cost calculated?
The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.
Is it possible to implement the project in another city in Kazakhstan?
Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.
What information is needed to get started?
You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.
[See also]
Related solutions
Office equipment for 10 employees
Layout, furniture, budget structure and supply of an office for 10 employees.
More detailsOffice equipment for 20 employees
Layout, furniture, budget structure and supply of an office for 20 employees.
More detailsOffice equipment for 50 employees
Layout, furniture, budget structure and supply of an office for 50 employees.
More details[Next step]
Get the project and line-by-line specification
Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.
