[Office scale]
Office equipment for 20 employees
Layout, furniture, budget structure and supply of an office for 20 employees.

[Short answer]
What you can check in advance
An office with 20 employees cannot be considered a multiplication of one desk per staff. It is necessary to add meeting rooms, managers, storage, waiting, focus zones, growth reserve and installation. First, the program of premises is checked, then a compact office with room for growth is created.
We’ll start with the floor plan and what your team needs. Then we can tell you what furniture fits, what it will cost and when we can install it.
Get a preliminary estimate[Price of error]
What to check before ordering
The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment.
unify the main series and finishes
consider product, logistics and installation as separate blocks
[Expert review]
See how the furniture fits your office
For the task “Equipping an office for 20 employees,” we are checking not a set of items, but the connection between people’s behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.
Useful capacity, not the maximum number of desks
We count workspaces along with aisles, common areas, storage, calls and peak team presence.
- Required evidence
- Balance of areas according to scenarios and simultaneous presence ratio
- What fails if overlooked
- High rated capacity reduces acoustics and forces employees to find a place to call or meet.
Growth without throwaway solutions
We plan spare power points, compatible modules and a phased rule for adding workstations instead of buying empty desks in advance.
- Required evidence
- Team growth scenarios and list of compatible modules
- What fails if overlooked
- Expansion is stopped due to a removed series, lack of electrical power or the inability to rebuild an existing series.
Electrical and cable route
We associate sockets, floor hatches, screens, charging and service access with a specific table configuration before releasing an order.
- Required evidence
- Combined plan of furniture and engineering points
- What fails if overlooked
- Extensions cross aisles and hatches become under supports or inaccessible after assembly.
[Result]
managed project for 20 employees
The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.
- 01
Brief and plan
We collect staff, premises, restrictions, budget guidelines and launch date.
- 02
Planning and selection
We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.
- 03
Specification
We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.
- 04
Delivery and acceptance
We label each shipment by zone, assemble the furniture and close every item in the acceptance report.
[Catalog]
Furniture worth a closer look
Work tables and stations
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogOffice chairs
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogMeeting tables
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogStorage systems
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalogUpholstered furniture
Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.
Open catalog[Q&A]
Questions about the solution “Office configuration for 20 employees”
Direct answers without unconfirmed prices, terms and local promises.
Discuss the problemWhat is included in the “Office configuration for 20 employees” solution?
The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.
What should be checked before approving the solution?
The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment. First of all: create several reserve places and do not overload the room with cabinets
How should the completed result be accepted?
Result criterion: managed project for 20 employees We check the layout, completeness, articles, finishes, assembly and comments on the act.
How is the cost calculated?
The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.
Is it possible to implement the project in another city in Kazakhstan?
Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.
What information is needed to get started?
You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.
[See also]
Related solutions
Office equipment for 10 employees
Layout, furniture, budget structure and supply of an office for 10 employees.
More detailsOffice equipment for 50 employees
Layout, furniture, budget structure and supply of an office for 50 employees.
More detailsOffice equipment for 100 employees
Layout, furniture, budget structure and supply of an office for 100 employees.
More details[Next step]
Get the project and line-by-line specification
Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.
