[Office scale]

Plan furniture for an office of 100 people

We’ll ask how many people are usually in the office at once. Together we’ll work out which desks to assign and how many tables to leave for teamwork. Then you can see how much room each area needs.

Office equipment for 100 employees - PoMo Union Office project

[Short answer]

What you can check in advance

An office with 100 employees cannot be considered the multiplication of one desk per staff. It is necessary to add meeting rooms, managers, storage, waiting, focus zones, growth reserve and installation. First, the program of premises is checked, then a corporate office with a single standard is formed.

We’ll start with the floor plan and what your team needs. Then we can tell you what furniture fits, what it will cost and when we can install it.

Get a preliminary estimate

[Price of error]

What to check before ordering

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment.

01

describe typical jobs and manage delivery by zone

02

unify the main series and finishes

03

consider product, logistics and installation as separate blocks

[Expert review]

See how the furniture fits your office

For the task “Equipping an office for 100 employees,” we are checking not a set of items, but the connection between people’s behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.

01

Corporate standard without reference to the picture

We fix the function, required parameters, acceptable analogues and replacement rules. This allows you to repeat the solution in branches and new queues.

Required evidence
Workplace standard and catalog of acceptable configurations
What fails if overlooked
Each branch purchases similar but incompatible furniture, and operating costs rise.
02

Pilot before the main party

We assemble one typical place or room and check the fit, electrical, materials, assembly and cleaning in real mode.

Required evidence
Pilot protocol and list of changes before launching the batch
What fails if overlooked
The same mistake is repeated dozens of times and becomes expensive only after full delivery.
03

Project Critical Path

We connect sample approval, production, finishing readiness, delivery and installation. The launch date is based on dependencies, not an optimistic promise.

Required evidence
A single schedule with responsible persons and decision freezing points
What fails if overlooked
Furniture arrives at an unfinished facility or installation begins after the date the employees leave.

[Result]

managed project for 100 employees

The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.

  1. 01

    Brief and plan

    We collect staff, premises, restrictions, budget guidelines and launch date.

  2. 02

    Planning and selection

    We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.

  3. 03

    Specification

    We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.

  4. 04

    Delivery and acceptance

    We label each shipment by zone, assemble the furniture and close every item in the acceptance report.

[Catalog]

Furniture worth a closer look

All catalog series

Work tables and stations

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Office chairs

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Meeting tables

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Storage systems

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Upholstered furniture

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

[Q&A]

Questions about the solution “Equipping an office for 100 employees”

Direct answers without unconfirmed prices, terms and local promises.

Discuss the problem
What is included in the “Office configuration for 100 employees” solution?

The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.

What should be checked before approving the solution?

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment. First of all: describe typical jobs and manage delivery by zones

How should the completed result be accepted?

Result criterion: managed project for 100 employees We check the layout, completeness, articles, finishes, assembly and comments on the act.

How is the cost calculated?

The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.

Is it possible to implement the project in another city in Kazakhstan?

Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.

What information is needed to get started?

You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.

[See also]

Related solutions

All pages of the section

Office equipment for 10 employees

Layout, furniture, budget structure and supply of an office for 10 employees.

More details

Office equipment for 20 employees

Layout, furniture, budget structure and supply of an office for 20 employees.

More details

Office equipment for 50 employees

Layout, furniture, budget structure and supply of an office for 50 employees.

More details

[Next step]

Get the project and line-by-line specification

Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.

Add project details

Have a floor plan? You can send it on WhatsApp.

Send your floor plan on WhatsApp

WhatsApp