[Office furniture systems]

Acoustic office pods and booths

Phone and meeting pods remove calls from open space when quantity, ventilation, power and placement reflect actual demand.

Acoustic office pods and booths — PoMo Union Office project

[Short answer]

What you can check in advance

Phone and meeting pods remove calls from open space when quantity, ventilation, power and placement reflect actual demand. The solution is tied to the plan, building services, actual workload and launch schedule, then recorded in a line-item specification.

We’ll start with the floor plan and what your team needs. Then we can tell you what furniture fits, what it will cost and when we can install it.

Get a preliminary estimate

[Price of error]

What to check before ordering

Choosing only by a picture or the price of one item makes the project impossible to control. One booth placed without usage data creates a queue and can obstruct a main circulation route.

01

Define the required level of speech privacy and background noise control.

02

Coordinate power, cable routes and service access before ordering.

03

Prevent queues, staff routes and evacuation paths from colliding.

[Expert review]

See how the furniture fits your office

For the problem “Acoustic booths and office pods” we are not testing a set of objects, but the connection between human behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.

01

Speech privacy and background

We divide the tasks: muffle a distracting conversation, hide the content of the conversation or isolate the call. Each problem requires its own set of solutions.

Required evidence
Map of noisy, quiet and private scenarios
What fails if overlooked
Screens create a visual boundary but do not address speech privacy or reduce distractions.
02

Electrical and cable route

We associate sockets, floor hatches, screens, charging and service access with a specific table configuration before releasing an order.

Required evidence
Combined plan of furniture and engineering points
What fails if overlooked
Extensions cross aisles and hatches become under supports or inaccessible after assembly.
03

Routes of people and services

We separate employees, visitors, queues, delivery and evacuation. Furniture should not turn a shortcut into a permanent detour.

Required evidence
Flow plan with peak usage scenarios
What fails if overlooked
The reception, kitchen or meeting room creates a traffic jam and distracts nearby workspaces.

[Result]

The result is a documented “Acoustic office pods and booths” solution that can be accepted against the plan, specification and delivered scope.

The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.

  1. 01

    Brief and plan

    We collect staff, premises, restrictions, budget guidelines and launch date.

  2. 02

    Planning and selection

    We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.

  3. 03

    Specification

    We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.

  4. 04

    Delivery and acceptance

    We label each shipment by zone, assemble the furniture and close every item in the acceptance report.

[Catalog]

Furniture worth a closer look

All catalog series

Partitions and screens

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Office chairs

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

Office accessories

Compare sizes and finishes. We’ll check what’s in stock and when it can be delivered.

Open catalog

[Q&A]

Questions about “Acoustic office pods and booths”

Direct answers without unconfirmed prices, terms and local promises.

Discuss the problem
What is included in “Acoustic office pods and booths”?

The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.

What should be checked before approving the solution?

Choosing only by a picture or the price of one item makes the project impossible to control. One booth placed without usage data creates a queue and can obstruct a main circulation route. First priority: Define the required level of speech privacy and background noise control.

How should the completed result be accepted?

Result criterion: The result is a documented “Acoustic office pods and booths” solution that can be accepted against the plan, specification and delivered scope. Check the plan, completeness, SKUs, finishes, assembly and recorded defects.

How is the cost calculated?

The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.

Is it possible to implement the project in another city in Kazakhstan?

Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.

What information is needed to get started?

You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.

[See also]

Related solutions

All pages of the section

Ergonomic office workstations

Desk, chair, screen, pedestal and power are designed as one workstation so employees can adjust their posture without losing useful space.

More details

Height-adjustable office workstations

Sit-stand desks encourage movement, but adjustment range, stability, controls and cable allowance must match actual users and equipment.

More details

Bench systems for 2, 4 and 6 employees

A bench system places several desks on one frame and saves space when screens, cables, supports and service access are planned together.

More details

[Next step]

Get the project and line-by-line specification

Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.

Add project details

Have a floor plan? You can send it on WhatsApp.

Send your floor plan on WhatsApp

WhatsApp